INTRODUCTION:
Welcome to the ENTERPRISE PROCUREMENT SYSTEM of RSP developed jointly with Metaljunction
Services Limited and hosted in the secure web-servers of Metaljunction. This manual
is a step by step guide to the proper use and maintenance of your data in the
ENTERPRISE PROCUREMENT SYSTEM (EPS) server. While developing this platform, we
have attempted to ensure that all possible combinations of terms and conditions
which normally apply to a Contract have been codified and presented in a manner
for enabling easy selection. The attempt also is to capture data at point of origin
and ensure a high level of accuracy by providing instant calculation of landed
cost of Supplier's bid.
Please note that the data that you read and enter in the ENTERPRISE PROCUREMENT
SYSTEM is stored in encrypted form and all steps are taken to ensure that the
server is secure and no tampering/intrusions take place. However, as indicated
in the declaration signed and submitted by you, both RSP as well as Metaljunction
do not assume any responsibility on this account in the event of unforeseen events.
Please go through the text of the declaration which has been agreed by you in
this regard.
Before you start using the live e-procurement site, please visit http://demo.commercejunction.com
and practice some dummy quotation submission. This is a demo site for getting
used to the various options. Please use the following while you log into this
site:
USER ID |
00010-01 |
00020-01 |
00030-01 |
15002-01 |
Password |
00010-01 |
00020-01 |
00030-01 |
15002-01 |
OBJECTIVES OF EPS
In implementing EPS, the following broad objectives have been kept in mind:
a. Absolute transparency in all transactions related to purchases by RSP
b. Reduction in time in receipt of Tender Enquiries , Orders, Payment information
etc by the Suppliers and avoiding loss in transit which often happens with physical
documents
c. Seamless availability to all data related to commercial transactions with
RSP
SCOPE OF EPS:
EPS shall cover the following:
a. Transmission of Tender Enquiries and Drawings to the Suppliers
b. On-line Bid submission by the Suppliers
c. On-Line Tender Opening by the Purchase Officers of RSP
d. View of Evaluated Bids (Comparative Statements ) by the Bidders
e. Transmission of Clarifications related to Bids
f. Transmission of Purchase Orders and Amendments to Purchase Orders
g. Entry of Inspection Requests by the Suppliers
h. Transmission of Inspection Reports/Certificates by RSP Inspection Officers
i. Entry of Manufacture Progress and Dispatch Details by Suppliers
j. Transmission of Goods Acceptance/Rejection Note by RSP Stores
k. Transmission of Bills Payment position by RSP Accounts
All the above Modules will get covered in phases. At present, the first 4 modules
are operational and this manual gives detailed instructions on how to use the
EPS system.
SYSTEM REQUIREMENTS:
Some of the minimum requirements for ensuring that the EPS pages load properly
in your PC are:
a. An internet connection, preferably a broadband connection of 256 kbps min
speed.
b. Internet Explorer version 5 or higher. Please note that EPS will not work
with other browsers at present. Your IE browser must have java permissions enabled.
If you are working behind a fire-wall, ensure that the EPS SITE is permitted.
c. Adobe Acrobat Reader which is free software available for download for opening
PDF files- the format used for saving and printing the Print version of your
quotations and drawings.
ACCESS TO SYSTEM AND SECURITY ISSUES:
Kindly note that the access to the EPS system is through the userid and password
allotted to you. The following are certain minimum security steps recommended
before you start using the system.
a. The password allotted to you is randomly generated by Computer and mailed
to you at the address given by you. When you log in for the first time, change
your password without fail. The new password you propose to use should ideally
be 8 or more characters long and should be a combination of alphabets and numbers
to ensure adequate security. However ensure that it is something you will remember
easily.
b. Do not use shorter passwords or those which can be guessed easily by others
working closely with you such as your name, date of birth etc.
c. Make it a practice to change the password at least once a month.
d. In case you forget your password, you are required to send a fax message
for reset of the password to Metaljunction along with your contact number. The
password will be reset after due verification of the origin and credentials
of the request. Password change request will be accepted only from the person
registered with MJ as the original allotter.
e. If you have assigned the userid and password to one of your employee for
carrying out the data entry job, please note that in the event of that employee
leaving your organization, there will be need for immediate change of password
to prevent access by that person. This is entirely your responsibility. Ideally,
you should login yourself and let the employee enter data thereafter. Please
note that any data entered by any employee or any other person to whom you have
given your password will be considered as valid and binding on you.
MAINTENANCE OF SUPPLIER'S PROFILE
1. Your profile as a supplier to RSP is initially entered by MJ on the basis
of data given in the declaration form submitted by you.
2. Please update your profile after you log in to the site.
3. For ensuring that all email alerts for RFQs, Orders etc reach you on time,
it is necessary for you to keep your profile up-to-date. Any change of email/
telephone no/ mobile numbers etc must be intimated immediately to both RSP and
MJ.
4. It is also necessary that you check your emails daily and delete old emails.
This will ensure that your email address does not expire due to lack of usage
and/or overflow of the allotted space. Please note that ISPs such as Sancharnet
provide limited inbox space and it is very essential to do regular house-keeping
to delete old mails. Also please note that RSP and MJ assume no responsibility
for mails not reaching you on time or for bounced mails. IT IS ADVISED THAT
INSTEAD OF WAITING FOR E-MAIL ALERTS, YOU DIRECTLY LOG-ON TO THE EPS SITE ONCE
DAILY TO CHECK WHETHER ANY NEW RFQs/ EVALUATED QUOTATION/ PURCHASE ORDER/ GOODS
RECEIPT INFORMATION/ PAYMENT INFORMATION ETC. HAVE BEEN POSTED. THIS IS A MUCH
MORE EFFECTIVE AND SAFER WAY THAN WAITING FOR EMAILS TO LOG IN TO EPS.
INSTRUCTIONS FOR USE
With the Introduction of EPS, RSP will not be sending any hard copy of Tender
Enquiries to you. All data relating to all tender enquiries (REQUEST FOR QUOTATION
hereinafter called RFQ) issued to you will be available in the EPS system. As
and when a RFQ is posted on the website, you will receive an email at the address
given by you in your declaration. For accessing the RFQs issued to you and submitting
Quotations against your Enquiries on the live site, please read the following
carefully:
1. Go to http://procurement.commercejunction.com
2. Log in with your user id and password. Ensure correct password.
3. You will see a page with links on the left showing Tenders, Quotations, Orders
& Receipts.
4. Click on TENDERS. In the next page, click on VIEW.
5. You will get a page with certain options. These options are basically "Filters"
for refining your search for the required data. For instance, the first option
is PROCUREMENT CATEGORY. If you click here, you will get a drop down menu showing
categories like Spares, Rolls, and Refractories etc. If you are not sure, leave
this option blank.
6. Similarly, the next option is RFQ OWNER. This means the Officer who has issued
the RFQ to you. This also shows a drop down menu with the names of the currently
active Purchase Officers of RSP. If you are not sure, ignore this option also
and leave the field blank. For the present ignore these options and click ENTER.
7. You will come to a page having further options. There is a drop down list
having following options:
OPEN FOR QUOTATION SUBMISSION
CLOSED- QUOTATION(S) NOT EVALUATED
CLOSED- QUOTATION(S) EVALUATE
DDELETED RFQ(S)
8. If this is a new enquiry where time is available for tender opening, select
option 1 and click ENTER. If the last date and time of bid submission is already
over and you have not responded to the RFQ, you will not get to see the RFQ
after the date of closing unless it is extended. If a RFQ is extended, you will
get a fresh email alert. You can also see the RFQ under the first option.
9. If you had already responded to the RFQ with a bid, you will be able to see
the RFQ under option two or three above. The second option is for those cases
where the bid has been opened by the purchase Officer but the comparative statement
(CS) has not been checked. The third option is those cases where the bid has
been evaluated and CS is available for you to see on the web-site.
10. Generally, the process of evaluation is instantaneous and you will be able
to see the CS on the same day of bid opening.
Submitting a Bid:
11. Coming back to the RFQ, on selecting the first option, i.e. OPEN FOR SUBMISSION,
you will now get a page listing all the Tender Enquiries which are awaiting
your quotation.
12. Click against each Enquiry Number and you will get to see the full details
and item specs, terms etc of that enquiry. Provision has also been made for
uploading drawings in PDF format (to be opened with Acrobat Reader, free software)
though this is not functional at present.
13. At the bottom of the RFQ, the applicable General terms and conditions are
provided. Click the relevant links and you can download/print these text files.
14. If you need to take a print, you can click the PRINT VERSION button available
at the top of the page just below page identification and above the organization
name
15. After reading the RFQ thoroughly, you are required to click the RESPOND
TO RFQ button at the bottom.
16. You will now get a page with two Radio Button options. The first one option
States "I have understood the RFQ in full and agree to submit quotation
on behalf of my organization". Please click this button if you wish to
quote and press ENTER at the bottom. If you do not wish to quote for this RFQ,
please click the next button which is meant for regretting. Once you click the
regret option, you may fill in the comment - i.e. the reasons for not quoting
in the box provided. This can be reasons like "Not in our manufacturing
range", "Terms not acceptable" etc.
17. If you have selected the first option, you will now get a confirmation which
will be worded like "Response to RFQ reference Code no. (The relevant RFQ
NO) Bid Part No.1 Modified successfully at May 18, 2006 10.00 AM (i.e. the date
on which you have submitted)".
18. Only after getting the above confirmation, you will be able to submit your
offer. For submitting your actual offer, select the Box QUOTATIONS appearing
on the left top of the page just below the Box TENDERS and click.
19. You will get a page having two options viz. VIEW and ADD. Select ADD and
click.
20. You will be presented with a form for submitting quotation. Depending upon
the speed of your Internet connection and the number of items in the RFQ, the
form will take some time to load. More the number of items, the longer will
be the time taken for page loading. Please wait until the page is fully loaded.
To check that the page is fully loaded, please scroll down till the bottom of
the page and check that the number of items is the same as the number of items
given in the RFQ and that you are able to see the button "SUBMIT"
at the Bottom.
21. Start entering the details of your quotation in the appropriate fields and
boxes provided in the form as follows:
Header Level:
a. First enter your Quotation reference number in the box provided. This is
a mandatory field.
b. Next field is for currency. The default is Indian Rupees. Do not change this
unless you are a foreign supplier quoting in a currency other than INR.
c. Next Follows a Comment Box. Here you can indicate the comments/deviations
in general which you are quoting compared to our RFQ terms. This box is of 50
characters max.
d. Please note that we have not provided an option for indicating delivery period.
This is because we have indicated in the RFQ our required delivery and it is
presumed that you have accepted our RFQ requirement. However, if you propose
a delivery period different from what is indicated in our RFQ, please indicate
your proposed delivery date in the comment box, which is subject to our evaluation/acceptance.
e. The next entry is for Delivery Term(s). For this as well as the subsequent
terms, a drop down box is generally provided from where you have to select one
of the options. When you select the delivery term, please ensure that this term
is consistent with Despatch Mode Term at the Header Level and Freight and Insurance
Terms which follow at Item level. For e.g. If you select F.O.R. ROURKELA or
F.O.R. RSP STORES, you are not to select FREIGHT EXTRA or INSURANCE BY RSP and
COURIER THROUGH RSP'S ZONAL OFFICE as Despatch Mode.
f. In the SPECIAL TERM(S) box, you may fill in special terms of your quotation
which may be at variance with indicated specs etc, though we advise you to keep
this to the minimum for ensuring acceptance of your offer.
g. Next follows the PAYMENT TERMS. We have provided 9 specific lines (options)
in this field. You are required to indicate the percentage payment against appropriate
lines. The general preferred payment is 100% against GARN which appears as the
first line. Please note that if you select more than one line in this term such
as 90% AGAINST GARN and 10% AGAINST PERFORMANCE REPORT/ FINAL ACCEPTANCE, the
values you enter i.e. 90 and 10 must add upto 100. If this does not happen,
then an error message will appear after you press submit showing that the term
does not add upto 100. From these 9 options you can select a maximum of 6 options
anytime during bid submission.
h. The boxes, which follow, are ORDER TO BE PLACED ON and PAYMENT TO BE MADE
TO. If you propose to authorize your Agent or Dealer to take the order and supply
then indicate the name, address and contact details of your Agent or Dealer.
Similarly, if the payment against supplies in this case is to be made to say
your Head Office or some other Agency, you must indicate the full details along
with Bank Account Number and IT Pan No of this Agency. If the order is to be
addressed to you and payment also made to you, leave these two boxes blank.
i. In the QUOTATION VALID TILL box, select from one of the 3 options.
j. In the S R I N / T I N NUMBER (IF VALID AS ON DATE) box indicates your VAT
TIN number/ SRIN number as applicable if you are in a State where VAT is implemented.
Otherwise mention Not Applicable
Item Level:
5. The data entry table for the item level details has the following columns:
Sequence; Attribute; Entry; Indicator; Value; Comment(s)
Only the Entry, Indicator and Comment(s) column are permitted for data
entry.
6. The term CODE below the Item Number indicates RSP's Catalogue Number for
the item. Please check this with RFQ details.
7. In the QUANTITY box, the quantity is pre-filled with the RFQ quantity. If
you are quoting for a lesser quantity you can enter the quantity you are quoting
for. If your standard packing does not match with the quantity indicated, the
column permits a higher quantity upto +5% of the RFQ quantity.
8. The item level table with the explanation of the various columns and how
to fill in is described below:
a. The column ENTRY is the place where you are required to indicate all the
values you are quoting such as Price, Excise Duty rate, CST rate etc.
b. The column INDICATOR is the place where you have to select whether you have
quoted in absolute value or percentage. This column has a drop down box. For
some terms you have only one option i.e. either value or percentage while for
some other terms, you have both options. Please select the correct one where
both options are presented. For e.g. if you are proposing to quote packing charges
as Rs.2 per unit, then you will have to select value. If you propose to quote
2% packing charges, then you will have to select percentage. Please ensure this
and cross check the 'VALUE' column to see that the data is correctly taken.
When you are clicking the drop down list in this column, you may notice a delay
for the drop down menu to respond. In such cases, click outside, on any free
area (not on a value field) and then come to the Indicator column and click
again and wait for the response.
c. The column COMMENT is provided for you to indicate item level deviations
for that term such as "discount for full quantity order" etc. Try
to avoid using the comment box unless absolutely necessary since the drop down
options cover most of the possible variations for enabling you to quote the
terms.
d. The column VALUE is an auto-calculated field where there is progressive calculation
of the values you have entered based on the indicators selected. For e.g. if
you say your basic price is 50 and packing charge is 2%, you will find that
the value for packing charge per unit of quote is calculated as Re.1. Please
note that for the value field to be calculated correctly, you have to exit the
entry field where you have currently entered/updated data. For this purpose,
you can click anywhere outside the entry field after entering the required percentage/
value and wait till the value column recalculates the presently entered data.
9. Attribute Number 2 - DISCOUNT can be either in percentage or value. Please
select correct indicator based on value. We suggest that you quote net price
instead of indicating a discount unless it is absolutely unavoidable.
10. Attribute Number 3 - SUPPLY ELEMENT IN RATE is for those cases where there
is partial supply and partial service portion such as application etc. If the
rate quoted by you does not have any incidence of Service element attracting
Service Tax, please select 100% which is the default value.
11. Attribute 4 -PACKING CHARGE(S) and Attribute 5- FORWARDING CHARGE(S)can
be in Percentage or Value - Default indicator is Percentage. Select correctly
after entering the value. Cross check with calculated value field.
12. For attributes 7-10, like Excise, CST etc., you are required to fill in
relevant figures - either as values or as percentages. For instance, for Excise,
there is a field which asks for "Excise Duty Payable during Contract".
You can enter the payable rate such as 16 percent (default data) or a desired
value or Nil. Cess on ED Extra has a default amount of 2 percent, which you
may change. Please select the appropriate Excise Duty Term under attribute number
7.
13. In Attribute 9, please indicate the relevant Excise Duty Tariff Heading
# under which you shall be clearing the goods.
14. Attributes 11, 12 & 13 are for those cases where the Basic Price quoted
by you includes the Excise Duty or CVD (for import items). In such case, you
are required to indicate the relevant details and the amount as value or percentage.
For e.g. if your base price is Rs.50 and this includes an excise element of
Rs.7 for which you will provide the CENVAT documents, you are required to indicate
as 7 which will be taken as absolute value. If you have indicated excise as
extra, do not fill in any data against these attributes.
15. Attribute 11 is the explanation term for attribute values you have entered
against 12 & 13. If you have not entered any value in Attribute12, ignore
this field completely. The following 3 options are available for selection :
a. ONLY ED + CESS ON ED INCLUDED
b. ONLY CVD + CESS ON CVD INCLUDED
c. ED/ CVD NOT INCLUSIVE, REFER ED EXTRA CLAUSE
16. Attribute 14 & 15 are for Central Sales Tax. If you are an Orissa-based
firm and the transaction is not an E-1 transaction, ignore these 2 fields. For
outside Orissa firms and Orissa firms selling on E-1, enter the correct values
and choose the correct option in the appropriate fields. These must be filled
in if CST is applicable.
17. The Attributes 16-20 are for the purpose of VAT applicable for Orissa firms.
Please note that for VAT, set off is available for RSP and hence when calculating
the landed cost net of Cenvat and VAT, SET OFF credit will be taken as per the
rate prevailing on date of tender opening. The presently available set off is
automatically calculated while showing you the Net Rate (landed cost net of
cenvat and VAT). Please select the attribute where the VAT percentage corresponds
to the VAT you propose to quote. For e.g. if you are quoting VAT @ 1%, indicate
1 against Attribute 17 and ignore attribute18-20. If you do not ensure this
the landed cost will be calculated wrongly for which RSP is not responsible.
Attribute 16 is for indicating the VAT explanation terms. If you have quoted
CST, select NOT APPLICABLE, INTERSTATE SALE; otherwise select EXTRA AT ACTUALS.
PRESENT RATE INDICATED.
18. Attribute 21: PLEASE ENTER 1 IF YOU HAVE ORISSA TIN#, ELSE 0 (ZERO) is a
Cenvatable Indicator. If the item is cenvatable, the value will be 1 (the default
value). If it is not cenvatable, value will be 0. If you are not sure, then
keep the value as 1. RSP will check and publish correct landed value taking
into account this aspect.
19. Attribute 23-25 relate to Freight. If your basic price is inclusive of freight,
use attribute 24 for indicating the freight value. If your basic price excludes
freight, indicate Freight to Pay per unit in attribute 25. If you have selected
attribute 24, then ignore attribute 25. When you select attribute 23, please
note that it does not contradict with the options selected by you in the attributes
at the Header Level.
In Attribute 23, select the correct option. The options are:
a. EXTRA, FREIGHT PAID, REIMBURSIBLE BY RSP: Here if you have quoted Rs.25 as
freight and paid to transporter, you will be reimbursed Rs.25. If the freight
bill shows Rs.20, you will be paid only Rs.20. If you pay more, you will not
get anything extra.
b. FREIGHT PAID, TO BE BORNE BY US: Here, the freight will be borne by you,
the supplier.
c. EXTRA; RSP TO PAY: This is to be selected if the goods are to be sent on
Freight to Pay basis.
d. NOT APPLICABLE: Select this only if you have entered some value against attribute
24, i.e., if the basic price is inclusive of freight.
20. Attributes 26 & 27 are for Orissa Entry Tax. For firms outside Orissa,
please note that RSP will be paying entry tax depending upon its applicability.
Hence select ORISSA ENTRY TAX PAYABLE EXTRA BY RSP. The maximum percentage of
OET is 2% for most items. This will be loaded in the landed price being a cost
to RSP. Even if you do not enter any value here, we will be loading this factor
for landed cost calculation while publishing the comparative statement of the
bids after opening. If you are an Orissa based firm, please note that you
must select the correct value and attribute which shall be applicable. If the
item is entry taxable and you have not entered any value here or indicated as
not applicable, then please note that RSP will not pay the entry tax and the
liability shall lie with you.
21. Attribute 28-30 relates to Insurance. If you have quoted ex-works or selected
F.O.R. STATION OF DESPATCH as Delivery Term(s), and insurance is payable extra,
indicate the applicable insurance if you are arranging insurance in attribute
29. If your price is F.O.R. Rourkela or F.O.R. STORES, then do not fill this
field, instead fill up the value in attribute 30. Attribute 28 explains
the insurance values you have entered. Select from the available options, ensuring
that there is no contradiction between this term and the Delivery Term(s) {Attribute1
at the Header Level}.
22. Attributes 31 and 32 are for Miscellaneous Charges which are not covered
under any of the above attributes. Some examples are pattern charges, drawing
charges etc. We recommend that such charges are either not quoted or kept
to the minimum. If you are indicating any such charges, indicate the total
payable for one unit of the item and indicate the break up in the Attribute
31 which is for detailing these charges.
23. Attribute 34 shows the Service Element in Rate. This is a calculated Value
and is derived from the Service Element percentage that you indicated in Attribute
3. For e.g. if you quote basic price of 100, a supply element of 60%, then the
service element is 40% of 100 and will be shown as Rs 40 in attribute 34.
24. Attribute 35 is meant for indicating the Service Tax (if there is a service
portion and this is applicable). Enter data against attribute 35 only if there
is a service portion in your quotation, otherwise ignore. If some data is entered
against attribute 35, then attribute 36 (Cess on Service Tax) gets automatically
calculated @ 2%.
Please note that in those cases where you are paying Service Tax on freight,
but the terms are freight prepaid (attribute 23 options 1 or 2), then do
not indicate this element separately. Include the service tax element on
freight in your freight amount and indicate in attribute 23.
25. Attributes 38 & 39 (Landed Rate and Net Rate) are calculated indicators
which show the Landed Cost at Rourkela Stores based on the terms and values
you have selected. Attribute 38 (Landed Rate) is the raw total. Attribute 39
(Net Rate) shows the Landed Cost Net of Cenvat and VAT ( LCNC). In this column,
if the items are cenvatable, the effects of Excise + Cess and VAT+ Cess are
deducted from the Landed Rate. If the items are not cenvatable, then the Net
Rate remains same as Landed Rate.
26. The box (Total Price Item) just below attribute 39 will show the total item
value which is the multiplication of Quantity Quoted x Net Rate.
27. If the RFQ contains more than one item, you may fill in the complete details
for item 1 first such as excise duty, sales tax etc. As you fill in the rates,
you will see the column VALUE on the right automatically calculating the landed
cost .This will enable you to see whether the values you are filling in are
correctly taken or not.
28. Once you have filled in the details for item 1, to avoid filling in all
the terms such as excise, sales tax etc for the rest of the items (if they are
the same rates), you can place a TICK in the box present at the beginning of
the second item. Once you do this, you will see that for the rest of the items,
the data entered against all the attributes except the Basic Price (Per Unit)
get copied. You will then have to fill in data for BASIC PRICE (PER UNIT) only,
for the remaining items. You can use this option where most of the items have
the same applicable attributes except a few, such as a different excise rate.
In such a case, if you use this facility, you will be required to change the
rates for those few attributes instead of all.
When copying the same data against all the attributes for all the items in
a tender/ RFQ, please ensure that in all those fields where you have indicated
specific values such as freight per unit, discount per unit (instead of percentages),
you check & edit the values applicable for each item. For e.g. suppose
for item 1, your basic price is Rs.100 and you have quoted a discount of Rs.10.
For item 2, the basic price is Rs.200. You mean to give a discount of Rs.15
here. But when you use the copy facility (Tick Box), the discount gets copied
as Rs.10. Therefore you must check Discount on Basic Price and change the value.
The following are the fields where you must check and update values if you use
the copy facility:
a. Basic Price : This does not get copied
b. Discount on Price : Check Value copied
c. Packing, Forwarding Charges : Check if you entered unit value instead of
%
d. Excise, VAT : If you entered Value instead of %
e. Misc. Charges, Application Charges :If you entered values or % in this field
f. Freight : Must be checked for all items individually
29. Once you have filled
in all the required fields correctly, you may press the button 'SUBMIT' at the
bottom of the page. Please note that if you do not see the buttons "SUBMIT"
and "RESET" at the bottom, it means that the quotation form has not
loaded properly. We recommend that you check full page loading before starting
your data entry.
30. When you press SUBMIT, if you have not entered certain fields correctly,
a response will be given stating that you must fill up the required field. Ensure
data entry as per these responses/ checks.
31. If all fields are correctly entered, you will be presented a confirmation
page on pressing SUBMIT. This page will indicate the complete details of what
you have filled in. At the bottom there are two Option Boxes - "CANCEL"
and "CONFIRM". If you find there are some mistakes which you want
to correct, press "CANCEL" which will take you back to the quotation
form. If you press "CONFIRM", then you will get a confirmation
page which will read as follows :
"QUOTATION (REFERENCE
CODE XXXX) FOR RFQ REF.CODE XXX BID PART NUMBER 1 ADDED SUCCESSFULLY AT MAY
22,2006, 4:56:32 PM."
Please note that only when you see this message, it will mean that your quotation
is now saved in the database.
We suggest that you keep a print out of this confirmation for your record.
32. To ensure that due to poor connections, the data you have filled in does
not get lost, requiring to be re-entered, please click "SUBMIT"
button at the bottom of the page after entering data for every one or two items
(if it is a multi item RFQ). You can always go back and modify the quotation
till the time before the official time and date of closure.
33. After you have submitted your quotation, till the date and time of opening
the quotation as indicated in the RFQ Bid End Date field, you and you alone
can view your quotations and if you need to update, follow the same procedure
as indicated in the steps above. When you submit an updated quotation, please
note that the quotations submitted by you earlier will not be considered or
available to RSP. While you can view all the versions of your quotations, RSP
will be able to consider your latest submitted quotation only for their
tender opening and evaluation. Thus if you have submitted one quotation on 22.5.2006
at 4.15 pm and another quotation at 4.16 PM, the quotation submitted at 4.16
PM will be the one which will be available to us for opening. The system ensures
the above security features.
34. Further, after the hour of closing (generally 1600 hrs) on the scheduled
date, the quotations will not be available even to you for updating or editing.
Thus if the closing date is 22.5.2006 at 16.00 hrs, you will not be able to
edit your quotation at 16.00.01 hrs, though you can always view your own quotation
(all the versions).
35. The data contained in your quotations will be stored in encrypted form in
the servers of metaljunction services limited and nobody at MJ or RSP will be
able to access this data. This is to ensure security of your data.
36. The moment a tender is CLOSED, the tender and your quotation(s) will be
available under the category "CLOSED, QUOTATIONS NOT EVALUATED".
37. If, after the expiry of the bid closing date, the Purchase Officer who has
issued the RFQ to you (i.e. the RFQ owner) extends the Date and Time for submission
of the Bids, then the RFQ and your bid will again flow back to the previous
category i.e. "OPEN FOR QUOTATION SUBMISSION". If an extension takes
place, then you will receive an email alert intimating you about the revised
date and time of tender opening.
38. The RFQ owner will electronically open all the quotations which are received
upto the date and time of bid opening.. Generally, the opening is done on or
after 11 AM on the next working day after the date of closing of bid submission.
For e.g. if the bid closing date is 22.5.2006 1600 hrs, the bid opening date
will be 23.5.2006 at 11 am onwards. When the RFQ owner issues the command
for bid opening, the encrypted bid data gets decrypted and is open for the Purchase
Officers as well as the bidders to see.
39. After the bids are opened and checked by the RFQ owner, a loading factor
on the price will be indicated for each of the bid item by him. This loading
factor takes into account the Net Rate which the system had calculated and shown
to you at the time of entering your bid , the loading factor for elements such
as freight, insurance , differing payment terms etc . This is to ensure that
if any contradictory terms have been indicated by you in your bid that makes
the Net Rate calculated by the system incorrect, the correction factor is applied.
40. Once the correction factor is applied, the RFQ and its related bids now
get transferred automatically to the category "CLOSED, QUOTATIONS EVALUATED".
For seeing the Comparative Statement of all the Bids received against a RFQ,
you can select this option and view your standing vis-à-vis your competitors.
This being an electronic bid opening, and the CS being posted on the EPS, you
do not have to depute representatives for attending bid openings any more.
We are also preparing a detailed self demonstrating manual which will be
available to you shortly on the website.
In Case of Any Problem:
In case of any problems in using EPS, please do the following:
* Refresh the webpage and try logging in again. Check the user code and user
password you are using; fill in correctly. Check if the CAPS LOCK is on or not
depending upon the password you have created.
* After you have logged in, if you have any problem in using EPS, click on "FAQ"
to get answer to your query.
* If the page is not opening, it is possible that the traffic is heavy at that
point of time. Try after gap of 10-15 minutes.
* Go to an alternate location having internet connection and try there.
* You may contact the following personnel:
Contact Person |
Organization |
Contact Number |
Barnali Dutta |
Metaljunction Services Limited |
9231000413 |
Sanujit Burma |
Metaljunction Services Limited |
9231000412 |
Bhaskar Sahu |
Metaljunction Services Limited |
033 22882606 extn 218 |
Rakesh Kumar |
Metaljunction Services Limited |
9337408051 |
G.S.Goswami |
Rourkela Steel Plant |
9861072776 |